Parcel 1319-12-000-018
Owners
FRANK SETTELMEYER NORTH LLC
PO BOX 395
GENOA, NV 89411
Parcel Summary
Location | 640 GENOA LN |
---|---|
Use Code | 698: Agricultural Deferred with Multiple Residences |
Tax District | 500: GENERAL COUNTY/CWS/MOSQ |
Acreage | 41.1000 |
Section | 12 |
Township | 13 |
Range | 19 |
Lot | 2 |
Plat Maps | 1319-12-000.pdf (927kb) |
Map Documents | 686474 Recorder Search |
Lineage | Split from 1319-12-000-004 |
Keyline Description
Created from split of Parcel # 1319-12-000-004Primary new parcel is Parcel # 1319-12-000-017
LDM 1006/5402
Value History
2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | |
---|---|---|---|---|---|---|---|
Total Building Value | $1,269,727 | $1,300,331 | $1,196,538 | $1,492,943 | $1,448,146 | $1,445,823 | $1,412,823 |
Total Extra Features Value | $486,911 | $508,812 | $462,756 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $286,200 | $286,200 | $284,195 | $280,817 | $255,560 | $172,446 | $157,360 |
Taxable Value | $2,042,838 | $2,095,343 | $1,943,489 | $1,773,760 | $1,703,706 | $1,618,269 | $1,570,183 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $714,993 | $733,370 | $680,221 | $620,816 | $596,297 | $566,394 | $549,564 |
New Improvements | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Instrument / Official Record | Date | Q/U | Type | V/I | Dcl Value | Ownership |
---|---|---|---|---|---|---|
GBS 637011 | 2005-02-18 | GRANT BARGAIN SALE DEED | Vacant | $6,800,000 | Grantor: SETTELMEYER, FRANK & SONS INC Grantee: FRANK SETTELMEYER NORTH LLC | |
CTO 637009 | 2005-02-18 | COURT ORDER | Vacant | $0 | Grantor: FRANK SETTELMEYER & SONS INC Grantee: BOYD, SEAN T RECEIVER |
Buildings
Building # 1, Section # 1, 38373 SFD #B, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1356 | $238,414 | 2008 | 2008 | 0.00% | 25.50% | 74.50% | $177,618 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0103 | Frame, Plywood |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0701 | Attached Garage | 616.00 |
Building # 2, Section # 1, 38374 SFD #C, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1356 | $238,414 | 2008 | 2008 | 0.00% | 25.50% | 74.50% | $177,618 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0103 | Frame, Plywood |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0701 | Attached Garage | 616.00 |
Building # 3, Section # 1, OFFICE #A, Office Building
Building # 4, Section # 1, POLE BARN #I, Farm Utility Shelter NoEW
Building # 5, Section # 1, POLE BARN #G, Farm Utility Shelter NoEW
Building # 6, Section # 1, POLE BARN #H, Farm Utility Shelter NoEW
Building # 7, Section # 1, POLE BARN (M), Farm Utility Shelter NoEW
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
CFW | CONCRETE FLAT WORK | 1016.00 | $8.50 | 2008 | $8,636 | 75% | $6,434 | $6,434 | ||
CCPC | CONCRETE-COVERED PORCH-COMP ROOF | 260.00 | $25.50 | 2008 | $6,630 | 75% | $4,939 | $4,939 | ||
LC | LATTICE COVER | 264.00 | $16.50 | 2008 | $4,356 | 75% | $3,245 | $3,245 | ||
VSI | VSI - UNITS/1,000 | 1.00 | $1,000.00 | 2008 | $1,000 | 75% | $745 | $745 | ||
VSI | VSI - UNITS/1,000 | 1.00 | $1,000.00 | 2008 | $1,000 | 75% | $745 | $745 | ||
CFW | CONCRETE FLAT WORK | 1016.00 | $8.50 | 2008 | $8,636 | 75% | $6,434 | $6,434 | ||
CCPC | CONCRETE-COVERED PORCH-COMP ROOF | 260.00 | $25.50 | 2008 | $6,630 | 75% | $4,939 | $4,939 | ||
LC | LATTICE COVER | 264.00 | $16.50 | 2008 | $4,356 | 75% | $3,245 | $3,245 | ||
M&ETY21 | MACHINERY & EQUIP/TYP 2-ONE SIDE OPEN-DC | 3000.00 | $14.20 | 2008 | $42,613 | 75% | $31,747 | $31,747 | ||
GPBLDG2 | GENERAL PURPOSE BLDG-DC | 3072.00 | $22.86 | 2008 | $70,227 | 75% | $52,319 | $52,319 | ||
SHOP2 | SHOPS-DC | 3600.00 | $34.98 | 2008 | $125,943 | 75% | $93,828 | $93,828 | ||
ASP | ASPHALT | 384.00 | $4.50 | 2008 | $1,728 | 75% | $1,287 | $1,287 | ||
CFW | CONCRETE FLAT WORK | 80.00 | $8.50 | 2008 | $680 | 75% | $507 | $507 | ||
CCPM2 | CONCRETE COVERED PORCH-METAL - 2 | 3660.00 | $27.50 | 2008 | $100,650 | 75% | $74,984 | $74,984 | ||
CFW | CONCRETE FLAT WORK | 5617.00 | $8.50 | 2008 | $47,745 | 75% | $35,570 | $35,570 | ||
FLAG | FLAGSTONE-VALLEY | 120.00 | $21.50 | 2008 | $2,580 | 75% | $1,922 | $1,922 | ||
DCPM2 | DIRT COVERED PORCH-METAL ROOF - 2 | 120.00 | $19.00 | 2008 | $2,280 | 75% | $1,699 | $1,699 | ||
CFW | CONCRETE FLAT WORK | 21.00 | $8.50 | 2008 | $179 | 75% | $133 | $133 | ||
ASP | ASPHALT | 2970.00 | $4.50 | 2008 | $13,365 | 75% | $9,957 | $9,957 | ||
WELL | WELL | 1.00 | $7,600.00 | 2008 | $7,600 | 75% | $5,662 | $5,662 | ||
SEPTIC | SEPTIC TANK | 2.00 | $7,600.00 | 2008 | $15,200 | 75% | $11,324 | $11,324 | ||
SQHDH | CATTLE SQUEEZE/HEAVY DUTY/HYDRAULIC-DC | 1.00 | $9,100.00 | 2008 | $9,100 | 75% | $6,780 | $6,780 | ||
DCPM3 | DIRT COVERED PORCH-METAL ROOF - 3 | 384.00 | $24.50 | 2008 | $9,408 | 75% | $7,009 | $7,009 | ||
CHUTHV | CORRAL LOADING CHUTE/SPACED/HEAVY-DC | 12.00 | $79.00 | 2008 | $948 | 75% | $706 | $706 | ||
CFW | CONCRETE FLAT WORK | 224.00 | $8.50 | 2008 | $1,904 | 75% | $1,418 | $1,418 | ||
WODP | WOOD OPEN DECK - DOUGLAS FIR | 44.00 | $17.50 | 2008 | $770 | 75% | $574 | $574 | ||
VSI | VSI - UNITS/1,000 | 5.00 | $1,000.00 | 2008 | $5,000 | 75% | $3,725 | $3,725 | ||
FENC5 | 4IN PIPE/2IN PIPE RAILS/FAIR QUALITY-DC | 1192.00 | $19.00 | 2008 | $22,648 | 75% | $16,873 | $16,873 | ||
ASP | ASPHALT | 29280.00 | $4.50 | 2008 | $131,760 | 75% | $98,161 | $98,161 |
Land Lines
Personal Property
None
Disclaimer
All parcel data on this page is for use by the Douglas County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Douglas County Assessor's Office as of January 13, 2025.