Parcel 1220-04-501-015
Owners
DEP GAI INVESTMENTS LLC
PO BOX 6723
GARDNERVILLE, NV 89460
Parcel Summary
Location | 1362 WATERLOO LN |
---|---|
Use Code | 330: Five or More Units - Low Rise |
Tax District | 521: TOWN OF GARDNERVILLE |
Acreage | 3.4400 |
Section | 04 |
Township | 12 |
Range | 20 |
Plat Maps | 1220-04-5.pdf (429kb) 1220-04-5A.pdf (217kb) 1220-04-5B.pdf (290kb) 1220-04-5C.pdf (273kb) |
Lineage | Split from 0000-25-431-120 |
Keyline Description
Changed from Parcel #0000-25-431-120Value History
2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | |
---|---|---|---|---|---|---|---|
Total Building Value | $1,118,714 | $1,184,836 | $1,066,672 | $1,163,180 | $1,133,717 | $1,144,537 | $1,156,423 |
Total Extra Features Value | $95,737 | $100,605 | $94,347 | $0 | $0 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $725,000 | $675,000 | $675,000 | $675,000 | $625,000 | $625,000 | $625,000 |
Taxable Value | $1,939,451 | $1,960,441 | $1,836,019 | $1,838,180 | $1,758,717 | $1,769,537 | $1,781,423 |
Net Exemptions Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Net Assessed Value | $678,808 | $686,154 | $642,607 | $643,363 | $615,551 | $619,338 | $623,498 |
New Improvements | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Instrument / Official Record | Date | Q/U | Type | V/I | Dcl Value | Ownership |
---|---|---|---|---|---|---|
GBS 841431 | 2014-04-23 | Q | GRANT BARGAIN SALE DEED | Improved | $2,650,000 | Grantor: BENTLY FAMILY LTD PARTNERSHIP Grantee: DEP GAI INVESTMENTS LLC |
Buildings
Building # 1, Section # 1, UNIT 20 (1978), Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1161 | $143,258 | 1978 | 1983 | 0.00% | 63.00% | 37.00% | $53,005 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 5.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 2, Section # 1, UNIT 11/12, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1152 | $138,239 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $40,781 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 | |
LIV | # Living Units | 50.00 |
Building # 3, Section # 1, UNIT 35/36, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1152 | $138,239 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $40,781 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 4, Section # 1, UNIT 37/38, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1152 | $138,239 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $40,781 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 5, Section # 1, UNIT 41/42, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1152 | $138,239 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $40,781 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 6, Section # 1, UNIT 9/10, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1296 | $151,502 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $44,693 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 7, Section # 1, UNIT 13/14, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1296 | $151,502 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $44,693 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 8, Section # 1, UNIT 15/16, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1296 | $151,502 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $44,693 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 9, Section # 1, UNIT 21/22, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1296 | $151,502 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $44,693 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 10, Section # 1, UNIT 5/6, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1440 | $164,382 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $48,493 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 11, Section # 1, UNIT 7/8, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1440 | $164,382 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $48,493 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 12, Section # 1, UNIT 23/24, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1440 | $164,382 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $48,493 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 13, Section # 1, UNIT 25/26, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1440 | $164,382 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $48,493 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 14, Section # 1, UNIT 27/28, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1440 | $164,382 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $48,493 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 15, Section # 1, UNIT 39/40, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1440 | $164,382 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $48,493 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 16, Section # 1, UNIT 43/44, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1440 | $164,382 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $48,493 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 17, Section # 1, UNIT 45/46, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1440 | $164,382 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $48,493 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 18, Section # 1, UNIT 47/48, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1440 | $164,382 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $48,493 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 19, Section # 1, UNIT 49/50, Duplex
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 05 | 1440 | $164,382 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $48,493 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 12.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 2.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 20, Section # 1, UNIT 1-4, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 2592 | $251,084 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $74,070 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 20.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 4.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
M#UNITS | Number of MultiFamily Units | 4.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 21, Section # 1, UNIT 17,18,19, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 2016 | $196,418 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $57,943 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 15.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 3.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
M#UNITS | Number of MultiFamily Units | 3.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 22, Section # 1, UNIT 29,30,31, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 1728 | $175,968 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $51,911 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 15.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 3.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
M#UNITS | Number of MultiFamily Units | 3.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 23, Section # 1, UNIT 32,33,34, Low-Rise Multiple
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 03 | 1872 | $186,300 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $54,959 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0211 | Galvanized Metal |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 15.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 3.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
HILL | Hillside Slope Adjustment | 1 | Flat |
M#UNITS | Number of MultiFamily Units | 3.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 |
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
CFW | CONCRETE FLAT WORK | 10875.00 | $8.50 | 1978 | $92,438 | 30% | $27,269 | $27,269 | ||
NLA4 | NON LIVING AREA #4 | 397.00 | $40.00 | 1978 | $15,880 | 30% | $4,685 | $4,685 | ||
SBLD | STORAGE BLDGS-W/FOUNDATION-120 SF+ | 1470.00 | $22.50 | 1978 | $33,075 | 30% | $9,757 | $9,757 | ||
ASP | ASPHALT | 39364.00 | $4.50 | 1978 | $177,138 | 30% | $52,256 | $52,256 | ||
VSI | VSI - UNITS/1,000 | 6.00 | $1,000.00 | 1978 | $6,000 | 30% | $1,770 | $1,770 |
Land Lines
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
CP006830 | Unsecured | DEP GAI INVESTMENTS LLC | CP - COMMERCIAL PROPERTY |
Disclaimer
All parcel data on this page is for use by the Douglas County Assessor for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Douglas County Assessor's Office as of January 11, 2025.